PROPOSED DEVELOPMENT OF SG. RASAU WATER SUPPLY SCHEME (STAGE 1), SELANGOR DARUL EHSAN, PACKAGE 1- DESIGN AND BUILD OF PROPOSED RASAU INTAKE, RAW WATER PUMPING MAINS, WATER TREATMENT PLANT AND ASSOCIATED WORKS / MARINE DOORS(1.5BAR)

Sinan Aphae- Haenam Hwawon (Site #1) Construction Work of Undersea Tunnel Water Tight Door(Water Level 90M)

Watertight Type Sheleter
Songjeong Marina Water Tight
Gwangmyung Station Water Tight Door
Samcheok Solar Energy Facility Water Tight Door (Top-down Type)
Daegu Dongseongno KEPCO (Korean electric power corporation) Water Tight Door
Yi Sun Shin Square Water Tight Door
Water Tight Door for Omokgyo Station-Hyundai Department Store Main Entrance
ROKAF 10th Fighter Wing
Samcheok Public Wastewater Treatment Plant Water Tight Door
Masan-Happo Senior Welfare Center Water Tight Door
SWING TYPE 切水門 (SMART PROJECT-MALAYSIA) - 226kN/m2
切水門 Bul-Gwang subway station - 12.3m
桑拿室 防水門
漢城地鐵外部出入口 切水門(望遠停車站) 設計要求 : 水位 +4.5 m
漢城地鐵換氣口切水門(6號線) 設計要求 : 水位 +4.5 m
切水門 升降方式 (UP-DOWN TYPE)
切水站開關式 (SWING TYPE)
臨時切水牆 (地鐵5號線 梧木橋 電車站)
三陟市市立博物館地下出入口切水門 - 1.5m
三陟市市立博物館地下出入口切水門 - 1.5m
Capstans(Jinhae Naval Base)
通風口用 切水門 - 1.5m
Theatre-City of Dream Macau(5 Psi)
Theatre-City of Dream Macau(5 Psi)
HillState SongDo the Sky Connecting Subway Passage
MARINE DOOR
ACCESS HATCH
VIEWPORT