YEMEN LANG Project(Sliding Blast Resistant Door -1.79bar)
Sliding Blast Resistant Door (Qatar Armed Forces Project 5.73 BAR)
The First Fleet of R.O.K Navy (Inspection Team) (해군1함대 감시대)
Hyundai Oil Bank
Gunsan Battery Stabilization Center Project(JIAT) (군산 배터리 안정화센타)
ADD(국방과학연구소) 거아도 Sliding Blast Resistant Door
Concrete Type Blast Resistant Door (3Bar) NCD Machine Room Entrance At 00 Project
Steel Type Blast Resistant Door (3Bar) Hyundai oilbank PCD entranc
Steel Type Blast Resistant Door (100Bar) Powder Magazine Entrance at 00 Project
Steel Type Blast Resistant Door Embeddment plate NBC shelter Ground facility at 94-5951
S-OIL(Onsan factory) NHC Blast Resistant Door
Agency for Defense Development (ADD, 40 Bar) / INPA TUNNEL / Darakdae Firing Range
1. Design Criteria
1.1) Pressure Release
1.1.1) Internal pressure at the beginning b = 12.67 bar = 186.2 psi
1.1.2) Internal pressure at the end b = 1.0 bar = 14.7 psi
1.1.3) Duration of the pressure release from start to end T = 8.04 second
1.2) Property of the 19.0 thick steel plate. Consider 12inches wide strip of the calculation S = bd2 / 6 = 12 * 0.752 / 6 = 1.125 in3 I = bd3 / 12 = 12 * 0.753 / 12 = 0.422 in4 1.3) Wide of Doors L= 36.0 inch
2. Calculation of the bending stress and Deflection
2.1) Bending moment and stress of the steel plate Assume pressure shall be linearly released at the speed of 0.5 seconds interval over the entire pressure release
2.1.1) Uniform pressure release W = 12 (186.2-14.7)/(8.04/0.5)= 128 lbs/in/0.5 second
2.1.2) Bending moment V M = wL2/8 = 128 * 362/8 = 20,736 in-ibs