NoItem/SupplyOrder sheet No.LevelDateCompanyOthers
1Bulletin proof Door & Bulletin proof windowFireproof Test for Bulletinproof door (UL10B)D-VER-95-081-SS1995. 10. 19
1996. 04. 23
DongAh ConstructionPapers inspection
Testing in Fire Insurers Laboratories of Korea
2WIRE MESH DOORD-VAR-96-010-SS1996. 04. 15DongAh ConstructionPapers Assessment
3STAINLESS STEEL SWING DOORD-VAR-96-014-SS1996. 04. 15DongAh ConstructionPapers Assessment
4ENTRANCE SWING DOORD-VAR-96-016-SS1996. 06. 27DongAh ConstructionPapers Assessment
5AUTO SLIDING DOORD-VAR-96-015-SS1996. 06. 27DongAh ConstructionPapers Assessment
6BLAST DOORNo.66T1996. 01. 12
~
1999. 01. 11
DongAh Construction

Document

Assessment

Korea

Institute

of Machinery

& Materials

1) DOOR Structure Calculation sheetNo.1250T1996. 12. 20
2) DOOR SHOP DWGNo.1250T1996. 12. 20
3) Welding process sheetNo.235T1997. 03. 14
4) General welding sheetNo.235T1997. 03. 14
5) Non-breaking testing management sheetNo.235T1997. 03. 14
6) Process sheet for AIR LEAKAGE TESTNo.417T1997. 05. 21
7) Function test for AIR LEAKAGEBS1225-466.MT1997. 09. 02
8) GASKET Certificate testReg. TS-1509T1997. 09. 11
15BLAST DOORDaewoo (Month 3.4)
No.98-0322
QCP 4

1998. 06. 29

~

2001. 05. 19

Daewoo Co.,Ltd.Papers Assessment
16

EQ. HATCH SHIELD DOOR

Structure calculation sheet

No.239

No.838

Q

Q

1997. 03. 15

~

1999. 06. 30

1997. 11. 08

DongAh Construction

DongAh Construction

Document Assessment
17METALIC DOORS & ASSEMBLYNo. 98-065T

1998. 02. 25

~

2001. 02. 24

Hyundai ConstructionCareer Assessment
18Nuclear Item of KEPCON9805-052S

1998. 05. 20

~

2001. 05. 19

Korea Electric Power CorporationDocument Assessment
19Nuclear Item of KEPCON9805-051T

1998. 05. 20

~

2001. 05. 19

Korea Electric Power CorporationDocument Assessment
20

SPECIAL DOOR & WINDOWS

PART-A
(RADIATION SHIELDING DOORS)

PART-B
(MISSILE RESISTANT DOOR,BUILET RESISTANT DOORS AND WINDOWS)

PART-C
(WATER THGHT AND AIRLOCK DOORS)

TAIWAN Fourth

Nuclear Power

Plant Units 1 & 2

–

2003. 04. 29

~

2004. 04. 30

TPC

(TAIWAN POWER COMPANY)

PQ Evaluationt

Technical test

21BLAST DOORDEAWOO
(WEUL-SUNG TRF)
No.03-166
T

2003. 09. 19

~

2006. 09. 16

Daewoo Co.,Ltd.Document Assessment