2026 - 2021

SUPREMACY

Leading technology in highly complex and specialized facilities, including the Agency for Defense Development

국방과학연구소 공사사진

2026

03.23

Restoration of UL Files for R 21261 and R 2154

03.20

Performed shock test simulation at 3 bar pressure according to MIL-STD-901D for Waterproof Swing Doors - Blast Protection Evaluation Project

03.18

Proceeding with A60 Fire Certification process for Marine Blast Proof Doors (EFECTIS)

2025

07.28

Approval of Electric Sliding Blast Proof Door for P180HF58 Large Test Vessel / Agency for Defense Development (ADD), Hyundai Heavy Industries

02.27

Approval of Emergency Waterproof Door for Undersea Tunnel (Shinan~Aphae) for 90M water level / Lotte E&C

2024

06.18

Japan Armed Forces FED (US Army in Japan) Project 4025 Approval / YSK-1558 Repair Yokosuka

05.23

Registered as an approved vendor for Gamuda Berhad

02.02

Japan Armed Forces FED (US Army in Japan) 4025 Approval

2022

11.21

Camp Arifjan, Kuwait US Army Project 4025 Approval

10.05

Signed an MOU with Safety Work Nisreen Factory (SSW) in Saudi Arabia

03.11

ISO 9001 Novation (Contract Transfer)

01.27

Vendor Approval for Qatar Armed Forces Project C-108-01 according to the JSP 482 Edition 4 (Sliding and Double Swing Blast Proof Door, 5.729 bar)

2021

10.01

Acquired Certification of Security Door (EN 1627 RC 4)

2020 - 2011

GLOBAL REACH

Successfully establishing a strong presence in global markets, including the Middle East, Europe, and Southeast Asia

해외시장 전시사진

2020

10.12

Vendor Approval for Repair ECMs in AHA 25, Camp Casey. (Igloo Magazine Blast Doors 7bar, 3bar US Army. CCK)

07.04

Vendor Approval for RIK, Repair Collective Protection System, CP Tang Korea. (Blast Doors 8bar, US Army. FED)

2018

09.20

Construction of Blast Test Laboratory (Capacity up to TNT 125kg)

2016

11

Acquired UL 10C Certification

2015

10

Acquired Certification of NBC Filter (NATO) from U.S Department of ENERGY

08

Acquired Certification of Blast Single Door (ASTM F 2247 / 20psi) from FAHSS / TUV NORD

08

Acquired Certification of Blast Double Door (ASTM F 2247 / 20psi) from FAHSS / TUV NORD

2014

09

Acquired Certification of Air Leakage (UL 1784) from Intertek Testing Services NA Ltd. (Intertek)

2012

12

Acquired Certification of Blast Valve (Blast Load: 3 BAR)

06

Vendor Approval for Steel Doors from YRP (10079D-VAR-A-12-009)

03

Memorandum of Understanding (MOU) with Priority Group in Pakistan

03

Acquired Certification of Acoustic Test (STC- 50 dB, ASTM E 90)

03

Vendor Approval for Blast Doors from IRAN OIL & GAS

2011

12

Vendor Approval for Steel Doors from FED (W912UM-D-D-0005)

06

Vendor Approval for Steel Doors from FED (2009MFH02200)

03

Vendor Approval for Blast Doors from IRAN OIL & GAS

2010 - 2005

SAFEGUARD

Specializing in nuclear power plant solutions and urban flood prevention systems

원자력발전소 공사

2009

08

Acquired Certification of EN-1143-1 Level VII (Lloyd’s Register)

06

Acquired Certification of ANSI A 250.4-2001 (Lloyd’s Register)

02

Vendor Approval for Blast Doors from Dubai World Central International Airport (No, MS-AMB-LAKSHMI-AR-088)

2007

01

Vendor Approval for Blast Doors from YEMGAS (No, YE-001-37-PCC-CNT-54009)

2006

06

Acquired ISO 14001 Certification

2005

08

Incorporated as "Samhoon Co., Ltd." (Conversion to Corporation)

01

Acquired UL Certification (1 1/2 Hours Fire Rating)

2004 - 1993

BUILD-UP

Establishing the foundations of national defense, including Marine Corps and Naval bases

방폭문

2004

12

Renewed Registration for ISO 9001:2000 Certification

10

Registered as an approved vendor for FLUOR (USA)

10

Registered as an approved vendor for Samsung Engineering Co., Ltd.

10

Registered as an approved vendor for Daewoo E&C Co., Ltd.

09

Registered as a material supplier for Exxon Mobil (USA)

08

Registered as an approved vendor for POSCO E&C Co., Ltd.

2003

10

Acquired UL Certification (File No.R21544)

08

Passed Surveillance Audit (ISO9001:2000 / KSA9001:2001)

07

Selected as Gyeonggi Frontier Enterprise (No.2003-47)

06

Acquired Certification for Blast Proof Door (40 Bar) / Agency for Defense Development (ADD) High Explosives Team

06

Acquired UL Certification (File No.R21261)

05

Acquired Test Evaluation Certification for Chinese National Standard CNS11527

2002

08

Registered Bidding Qualification for Foreign Procurement - Incheon Regional Public Procurement Service

03

Registered with US Army CCK

02

Registered Bidding Qualification for Domestic Procurement - Incheon Regional Public Procurement Service

2001

12

Acquired ISO 9001 : 2000 Certification

09

Relocated Samhoon Machinery Bucheon Office

1993

08

Established Samhoon Machinery (Foundation)