2015' CONSTRUCTION RECORDS
no Construction Period Volume Contract Content
Blast Valve 2015.03.03 3SETS PEYMAB CO. South Pars Gas Field Development - Phases 22, 23 & 24 (Iran)
Blast Door 2015.05.30 7 SETS CAZ(THAILAND) Co.,Ltd Liner Alkyl Benzene
Fire rate door Bar/2HR 2015.09.18 3 SETS Samyang System and Control Co.,Ltd KOC Project